Sugarcreek Concrete is powered by solar panels
- Project
- Millersburg, OH
System Size: 56.4 kW
Installation Type: Roof Mount
Installation Date: October 2020
Location: Millersburg, OH
Annual Environmental Offset: 47.2 tons of CO2 or preserving 1,099 trees
Sugarcreek Concrete has installed 141 solar panels on the roof of its facility in Millersburg, OH. Mounted on two roof surfaces, this solar system will produce 60,710 kWh a year, offsetting nearly 90% of its electricity usage.
Get Honest Answers To All Your Solar Questions
This free resource will give you an honest, up-to-date comprehensive look at all things solar, saving you a ton of research time.
Download our solar guide to be on your way to a successful solar investment.